Why a new distribution mode?
Because it meets all your requirements in terms of installation costs, communication, performance (high capacities) and ease of implementation.
Very attractive installation costs
When several islands coexist, were you aware that the cost of installing them is closely related to the machine's wiring architecture?
This a very important point: thanks to a substantial reduction in the number of components such as terminal boards, distribution units, cables, raceways and wiring, both the implementation and the maintenance of the installation as a whole become highly cost-effective.
The 2000 series islands consist of a subbase, which includes the electrical and pneumatic valves into which the distributors are plugged ("Plug in" technology).
Efficient, advanced and highly flexible architecture
|
It is very easy to optimise the fieldbus: a single connection on the master island is sufficient for the control engineer to establish:
|
Help in commissioning
Thanks to the Manual Configuration Module (MCM), which can be placed anywhere on the master island, the operator can run various tests on all the connected islands on his own without a PC or a PLC.
To make it easier to configure the installation, the MCM allows the bus address to be set with encoder wheels (according to certain protocols).
Several modes are available:
- Testing of all outputs through successive activations (coils and output modules)
- Testing of each digital input activating even or odd outputs
Please note: With a view to minimising downtime, all changes of electronic cards or quick coupler diameter are made via the front panel, without the need to dismantle the island.
Technical information on our documentation page Distribution islands




